Specifications
Brand Name :
YT
Model Number :
Almost All KOMATSU Models
Place of Origin :
China
MOQ :
1PCS
Price :
Negotiable
Payment Terms :
L/C, T/T
Supply Ability :
10000 PCS/Month
Delivery Time :
7-30 Days
Packaging Details :
Standard Export Packaging
Material :
Alloy Steel
Appliion :
Crawler Excavator
Colour :
Yellow or Customer Required
Part Name :
Bucket I linkage
MOQ :
1 PCS
Special Service :
Custom Tailor
Dimension :
Standard
Features :
Durable
Description

PC300/PC200 Heavy Guarantee Yellow Color Bucket I Linkage Bulldozer & Excavator Spare Parts Link Rod Bucket Arm Link

1. What is the Bucket I Linkage?


PC300 / PC200 Excavator Bucket Linkage Alloy Steel Excavator Track Parts

2. Suitable Excavators

/CASE/DAEWOO/HITACHI/HYDUNDAI/KOMATSU/SAMSUNG/

/ KOBELCO/SANY/ SUMITOMO/ KATO/DOOSAN/ LOVOL/ SUNWARD

3. Our Advantages

* World-Class Quality

* Factory Sale Directly With Reasonable Price

* 35 Years' Experience In Excavator & Bulldozer Spare Parts Manufacturing

* Flexible Payment Terms Including T/T, L/C And So On

* Fast Delivery Within 30 Days After Contract Established

* Professional Sales Team, Quality Inspection, And Report, Maritime Logistics Guidance

* After-Sale Service: Video Technical Support, 24h Online Support

4. Feedback

PC300 / PC200 Excavator Bucket Linkage Alloy Steel Excavator Track Parts

5. FAQ

  • You Are A Trader Or A Manufacture?

We Are An Industry And Trade Integration Business, Our Factory Loed In Quanzhou, And Our Sales Department Is In The Center Of Xiamen City.

  • How Can I Be Sure The Part Will Fit My Excavator?

Give Us Correct Model Number/Machine Serial Number/ Any Numbers On The Parts Itself Or Measure The Parts Give Us Dimension Or Drawing.

  • How About The Payment Terms?

We Usually Accept T/T Or L/C. Other Terms Also Could Be Negotiated.

  • What Is Your Minimum Order?

It Depends On What You Are Buying. Normally, Our Minimum Order Is USD5000. One 20’ Full Container And LCL Container (Less Than A Container Load) Can Be Acceptable.

  • What Is Your Delivery Time?

FOB Xiamen Or Any Chinese Port: 35-45 Days. If There Are Any Parts In Stock, Our Delivery Time Is Only 7-10 Days.

  • What About Quality Control?

We Have A Perfect QC System For The Perfect Products. A Team Who Will Detect The Product Quality And Specifiion Piece Carefully, Monitoring Every Production Process Until Packing Is Complete, To Ensure Product Safety Into The Container.

Send your message to this supplier
Send Now

PC300 / PC200 Excavator Bucket Linkage Alloy Steel Excavator Track Parts

Ask Latest Price
Watch Video
Brand Name :
YT
Model Number :
Almost All KOMATSU Models
Place of Origin :
China
MOQ :
1PCS
Price :
Negotiable
Payment Terms :
L/C, T/T
Contact Supplier
video
PC300 / PC200 Excavator Bucket Linkage Alloy Steel Excavator Track Parts
PC300 / PC200 Excavator Bucket Linkage Alloy Steel Excavator Track Parts
PC300 / PC200 Excavator Bucket Linkage Alloy Steel Excavator Track Parts

XIAMEN YINTAI MACHINERY CO., LTD.

Verified Supplier
7 Years
fujian, xiamen
Since 2011
Business Type :
Manufacturer, Exporter
Total Annual :
10Million-20Million
Employee Number :
50~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement