Unique Q345B 30mm Thickness Diaphragm Wall Grab Foundation Construction
Main feature:
1. Easy for operation and maintenance.
2. Multifunction & high efficiency.
3. High reliable & stable quality.
4. Low noise & low emission.
5. Good performance.
Unique Piling underground diaphragm wall grabs use a dedicated groove (hole) device, along a predetermined deep base position or around the original underground structure, digging a certain width and depth groove (hole), then set the reinforcement cage in the groove (hole), pouring concrete, building a wall (pile), connect into a continuous underground reinforced concrete wall in a joint way. Underground diaphragm wall have widely use, mainly used in the basement of buildings, subways, tunnels, docks, water cut walls, retaining walls, etc.
DIAPHRAGM WALL GRABS TECHNICAL DATA
Length of grooving (a) | 3500 mm |
Width of grooving (b) | 400~1000 mm |
Depth of grooving | 60 m |
Capacity of grab bucket | 0.8~1.8 m³ |
Diameter of steel wire rope | 28 m |
Weight | 9.8~11.9 t |
Grab weight | 9~11.5 t |
Excavation volum | 0.85~1.3 m³ |
Excavators weight | 2~3 t |
Crawler cranes | ≤40 t |
Requirements | pull 200 KN |