Second-Hand Double-Sided Automatic Plate Coating Laminating Machine
Descripition:
Use of hi-tech servo control, synchronization control, electric control, color code sensor on the version and other advanced technology. Equipment performance up to the advanced world level, solve the high-end packaging products, improve the grade of product packaging and security capability.
Main technical Datas:
Item | UW-Z95-900 | UW-Z100-1600 | UW-Z120-2400 | UW-Z150-3600 |
Die lip width | 1000mm | 1650mm | 2500mm | 3700mm |
Width of product | 200-850mm | 800-1500mm | 1000-2400mm | 2000-3500mm |
Max coating speed | 236m/min | 236m/min | 130m/min | 100m/min |
coat thickness | 0.008-0.03mm-0.05 | |||
Screw diameter | 95mm | 100mm | 120mm | 150mm |
Ratio of L/D | 30:1 | 30:1 | 30:1 | 30:1 |
Max. roll diameter of unwinding and winding | 1100mm | 1200mm | 1200mm | 1200mm |
Overall sizes (L*W*H) | 158000×7500×2300mm | 16800×11000×2800mm | 13300×13000×3200mm | 14800×14000×3400mm |
System installed capacity | 130kw | 150kw | 260kw | 300kw |
Photo:
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
5.How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.