1500 8 Shuttle Used Circular Loom Machine For Woven Bag
Descripition:
Changzhou United Win Pack Co.,Ltd, Founded in 2010 at Changzhou City, Jiangsu Province, China, We are professional for complete line of PP Woven bag making machines such as Cement Woven Bag Making Machine, Rice Woven Bag Making Machine, fertilizer Woven Bag Making Machine, Grain Woven Bag Making Machine, corn Woven Bag Making Machine, soybean Woven bag making machines, sesame Woven Bag Making Machine, Jumbo Woven Bag Making Machine, FIBC Woven Bag Making Machine, and Mesh Bag Making Machine, Leno Bag Making Machine, Plastic Rope Making Machine as well.We also make PP Woven bag Production Line such as Cement Woven Bag Production Line, Rice Woven Bag Production Line, fertilizer Woven Bag Production Line, Grain Woven Bag Production Line, corn Woven Bag Production Line, soybean Woven bag Production Line,sesame Woven Bag Production Line, Jumbo Woven Bag Production Line, FIBC Woven Bag Production Line, and Mesh Bag Production Line, Leno Bag Production Line, Plastic Rope Production Line.
Main Technical Parameter:
No.s | Mould | Shuttle Qty. (pcs) | Max.fold width (mm) | Max. Open width (mm) | Warp no.s (pcs) | Speed (RPM) | Main power (KW) |
1 | SPCL-24/16000 | 24 | 8200 | 16400 | 8000 | 5~25 | 37 |
2 | SPCL-20/11000 | 20 | 5500 | 11000 | 5376 | 5~28 | 22 |
3 | SPCL-16/8300 | 16(12) | 4150 | 8300 | 4800 | 5~41 | 18.5 |
4 | SPCL-12/7800 | 12(14) | 3900 | 7800 | 4400 | 5~41 | 18.5 |
5 | SPCL-12/7200 | 12(14) | 3600 | 7200 | 3780 | 5~45 | 18.5 |
6 | SPCL-12/6500 | 12 | 3250 | 6500 | 3520 | 5~51 | 11/15 |
7 | SPCL-12/6000 | 12(10) | 3050 | 6100 | 3200 | 5~51 | 11/15 |
8 | SPCL-12/5400 | 12(10) | 2700 | 5400 | 2880 | 5~64 | 11/15 |
9 | SPCL-10/4800 | 10(8) | 2400 | 4800 | 2880 | 5~64 | 11 |
10 | SPCL-10/4400 | 10(8) | 2200 | 4400 | 2640 | 5~72 | 7.5/11 |
11 | SPCL-8/3500 | 8 | 1650 | 3600 | 1966 | 5~80 | 7.5 |
12 | SPCL-6/3200 | 6(8) | 1400 | 3000 | 1820 | 5~80 | 7.5 |
13 | SPCL-6/2700 | 6 | 1350 | 2700 | 1510 | 5~100 | 7.5 |
Machine Photo:
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
5.How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.