KJZ High-Speed Mixer/Granulator PLC Intelligent Control Highly Automated
Description:
It is widely used for pharmaceutical industry, foodstuff industry, chemical industry, powder metallurgy industry, dyestuff industry, etc. for powder mixing , wet mixing and granulating
Feature:
1. Mixing uniformly, less amount of binder, strong adhering.
2. The productive process is sealed and no dead corner, granulating uniform, easy to clean. It conforms to the requirements of GMP.
3. Compared with horizontal cylinder granulating technique, its mixing effect is more reasonable.
Specifications:
10 | 100 | 200 | 400 | ||
Container`s volume | L | 10 | 100 | 200 | 400 |
Working volume | L | 60 | 65 | 130 | 275 |
Mixing speed | rpm | 430/660 | 170/255 | 155/193 | 106/160 |
Power of mixing | kw | 0.6/1.1 | 6.5/8 | 13/16 | 18/26 |
Cutting speed | rpm | 1410/2850 | 1400/2800 | 1500/3000 | 1500/3000 |
Power of cutting | kw | 0.6/1.5 | 2.4/3 | 4.5/5.5 | 5.5/7.5 |
Installation size for reference | H1(mm) | 360 | 1100 | 1200 | 1300 |
H2(mm) | 950 | 2100 | 2350 | 2650 | |
B(mm) | 350 | 850 | 1050 | 1215 | |
L(mm) | 1050 | 2400 | 2600 | 2780 |
Application:
Company Information:
FAQ:
1. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
2. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
3. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
4. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
5. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
6. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
7. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
8. How many days will you finish installing?
We will finish installation and training within 15 days.