Energy Saving Vacuum Frying Machine 0.4~0.8mpa Steam / Thermal Oil Heating
1. Pressure Test
Close the door and the line valve on the frying pot. Turn on the cooling water supply system and the vacuum pump. Check the frying pot, pipeline, valve for leaks. When the vacuum is -0.095MPa, turn off the vacuum pump and keep pressure for five minutes. The pressure drop is not more than 10% is normal, otherwise re-detection until qualified.
Note: The holding pressure is generally required in the following two cases. First, the equipment is debugged after installation; second, the downtime is long, and the production is restarted.
2. PLC Interface
The machine uses Mitsubishi control system. The system adopts PLC programming control, which can be converted from automatically to manually. In the automatic state, the temperature, pressure, time and speed can be automatic controlled.
3. Oil Filter Integrated Design
We have vacuum oil filter tank to match with our automatic snacks vacuum frying equipment. The whole process is also automatic. There is an vacuum pump on the filter tank, it can pump the oil from storage tank into the filter tank.
We all know after several batches, there will be bad smell and also dirty scrap(sugar) in the oil. In order to keep good quality of final chips, the oil need to be filtered.
4. Low Noise
Low noise because we applied a small invention for the vacuum pump on our machine, it is atmospheric ejector, which make the noise is below 60db.
The boiling point of water under normal pressure is 100 ° C. The vacuum system is in a negative pressure, as the pressure in the system decreases, the boiling point of water decreases accordingly. When the degree of vacuum is 700 mmHg, according to Clausius --- Clapeyron relation, the boiling point of water is 40 ° C. At this time, using oil as a heat-transfer medium, the boiling point of water can be reached at a lower temperature, and moisture (free water and partially bound water) in the food is evaporated by heat, then the food will be in a loose and porous structure.
The air content in the vacuum system is lower than the atmospheric environment and the oxygen content is also low. The frying process is carried out in a low oxygen content state, which can alleviate or even avoid the harm caused by oxidation, such as fat rancidity, enzymatic browning and oxidative deterioration.
No. | Model | Capacity | Heating Method | Total Power |
1 | VF-LY50 | 50kg/h | Steam/Electrical | 15kw |
2 | VF-LY100 | 100kg/h | Steam/Electrical | 22kw |
3 | VF-LY200 | 200kg/h | Steam/Electrical | 30kw |
4 | Customized | / | Steam/Electrical | / |
Catalog for Automatic Vacuum Frying Machine.pdf
In recent years, our company's technological innovation has continued to develop. The number of invention patents has continuously increased. Companies in good faith, quality, innovation, professionalism, unity, and enterprising, to achieve manufacturing, installation, one-stop after-sales service. We can better serve our customers. Excellent professional technical and sales talents, as well as advanced technology and engineering level, will solve the challenges you face in the production.
Our company will sincerely cooperate with friends from all walks of life to develop together.
1. Fumigation wooden case with water-proof embrace
2. Nude pack after plastic film wrapping
3. Upon your requirements
We provide high quality service:
1) Consultation before, during, and after sales;
2) Project planning and design;
3) Debugging until everything is functional;
4) Shipping management from factory to the destination;
5) Installing, maintenance and operation training;
6) New production techniques and formulas;
7) 1 year complete warranty and life-time maintenance service.
FAQ
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacturer. You will get competitive price and high quality.
3) Can you guarantee your quality?
Of course. We are the factory. More important, we put a high value on our reputation. High quality is our principle all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place an order, for small quantity 15-20 days is enough. For big quantity, we can talk further.
5) What about the transportation and delivery date?
Normally we use sea for shipment to save customer's money. It is about 25-40 days. It also depends on which country and port you are.