Effective Deoiling Vacuum Frying Equipment , Automatic Chips Frying Machine
1. The main parts of the machine are all made of stainless steel.
2. The frying basket adopts a round frying basket. When the oil is degreased, the products are evenly distributed. There is no accumulation, no dead angle and good de-oiling effect. The large space of the basket will not stick. The lock of the basket is fast and easy to operate.
3. The specially designed water-ring vacuum system ensures a vacuum of -0.098 MPa, which can shorten the processing time and low oil content. The vacuum of the ordinary water-ring pump only reaches -0.096 MPa.
4. The heater is made of the stainless steel tube structure, the temperature rises rapidly. The oil temperature is constant, which ensures the color, fragrance, taste and shape of the finished product.
5. Pneumatic valve, no need for manual switch to avoid manual burns.
Vacuum Fryer Process Features
Vacuum frying is frying and dehydrating food at low temperature (80 ~ 120 ℃), which can effectively reduce the damage of high temperature to food nutritional components.
Vacuum frying and degreasing has a unique effect. Currently it is mainly used: ① fruits: apple, kiwi, wood grape, persimmon, strawberry, grape, peach, pear, etc .; ② vegetables: tomatoes, sweet potatoes, potatoes, green beans, shiitake mushrooms, mushrooms, garlic, carrots, green peppers, Pumpkin, onion, etc .; ③ dried fruits: jujube, peanuts, etc .; ④ aquatic products and livestock and poultry meat.
Type | VF-LY50 | VF-LY100 | VF-LY200 |
Basket Size | Φ600mm | Φ750mm | Φ1200mm |
L*W*H | 1400*3500*2500 | 1800*4000*2900 | 2500*4500*3100 |
Vacuum Degree | -0.095mpa~-0.098mpa | -0.095mpa~-0.098mpa | -0.095mpa~-0.098mpa |
Steam Pressure | 4-8kg | 4-8kg | 4-8kg |
Working temperature | 75-110℃ | 75-110℃ | 75-110℃ |
Pump Power | 3kw | 5.5kw | 7.5kw |
Vacuum Pump Power | 7.5kw | 11kw | 15kw |
Motor Power | 3kw | 3kw | 3kw |
Capacity | 80kg | 120kg | 200kg |
50kg | 90kg | 170kg |
1) Vacuum frying cans
2) Oil heating system
3) Vacuum systems
4) Oil storage systems
5) Pneumatic systems
6) Automatic de-oiling systems
7) Electrical control systems
Catalog for Automatic Vacuum Frying Machine.pdf
In recent years, our company's technological innovation has continued to develop. The number of invention patents has continuously increased. Companies in good faith, quality, innovation, professionalism, unity, and enterprising, to achieve manufacturing, installation, one-stop after-sales service. We can better serve our customers. Excellent professional technical and sales talents, as well as advanced technology and engineering level, will solve the challenges you face in the production.
Our company will sincerely cooperate with friends from all walks of life to develop together.
Packing & Delivery
1. Fumigation wooden case with water-proof embrace
2. Nude pack after plastic film wrapping
3. Upon your requirements
After-sale service
We provide high quality service:
1) Consultation before, during, and after sales;
2) Project planning and design;
3) Debugging until everything is functional;
4) Shipping management from factory to the destination;
5) Installing, maintenance and operation training;
6) New production techniques and formulas;
7) 1 year complete warranty and life-time maintenance service.
FAQ
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacturer. You will get competitive price and high quality.
3) Can you guarantee your quality?
Of course. We are the factory. More important, we put a high value on our reputation. High quality is our principle all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place an order, for small quantity 15-20 days is enough. For big quantity, we can talk further.
5) What about the transportation and delivery date?
Normally we use sea for shipment to save customer's money. It is about 25-40 days. It also depends on which country and port you are.