The Sewage Treatment Plant comes in a Square Modular shape, making it easy to install and transport. The modular design also allows for easy expansion and customization of the plant to meet specific requirements. The system is designed to be energy-efficient and low-maintenance, reducing operating costs and ensuring long-term reliability.
Our Sewage Treatment Plant comes with a 1 Year warranty, ensuring that the plant operates optimally and meets the required standards. The plant is suitable for a variety of applications, including wastewater treatment and sewage water treatment for hospitals, residential areas, industrial facilities, and more.
Weight (kg) | Customizable |
Operation Mode | Automatic |
Material | Carbon Steel |
Shape | Square Modular |
Power Supply | 220V/380V, 50Hz/60Hz |
Recovery Rate | 80-99% |
Function | Multifunction |
Application | Wastewater Treatment, Sewage Water Treatment |
After-sales Service Provided | Drawings, Videos, On-site Service |
Warranty | 1 Year |
Henan Yanjiang Environmental Technology Co., Ltd. as a professional integrated environmental service provider, Committed to the continuous improvement of traditional business and the development of forward-looking business, for the global cities, towns and enterprises, to provide environmental and development of the overall solution and long-term stewardship service, in the field of environmental pollution control and facility operation, sewage treatment, seawater desalination, water purification equipment and water reuse, organic waste comprehensive utilization and biomass energy development and utilization, the environment Business activities are carried out in the fields of restoration, environmental safety management, environmental advisory services and environmental investment and financing management.
Q1: What is the brand name of the Sewage Treatment Plant?
A1: The brand name of the Sewage Treatment Plant is Yanjiang.
Q2: What is the model number of the Sewage Treatment Plant?
A2: The model number of the Sewage Treatment Plant is 02.
Q3: What is the place of origin of the Sewage Treatment Plant?
A3: The place of origin of the Sewage Treatment Plant is China.
Q4: What certifications does the Sewage Treatment Plant have?
A4: The Sewage Treatment Plant has CE and ISO certifications.
Q5: What is the delivery time of the Sewage Treatment Plant?
A5: The delivery time of the Sewage Treatment Plant is 15-20 work days.