The parameter of submersible type aerator :
Model | Power |
| Wwrking range | Depth minB*(m) | Air inlet pipe dia(m) | max air amount | dissolved air amount(kgo2/h) | weight(kg) |
HP | KW | |||||||
AR-32-40 | 2 | 1.5 | 1-2 | 1-3 | 40 | 30 | 2-1 | 104 |
AR-33-50 | 3 | 2.2 | 2.5-5 | 1-4 | 50 | 40 | 3-2 | 117 |
AR-35-65 | 5 | 3.7 | 3-6 | 1-4 | 65 | 80 | 5-3 | 132 |
AR-37-65 | 71/2 | 5.5 | 3.5-7 | 1-4 | 65 | 128 | 9-5 | 279 |
AR-310-80 | 4 | 7.5 | 4.5-9 | 1.5-4.5 | 80 | 170 | 13-7 | 286 |
AR-315-80 | 15 | 11 | 5-10 | 1.5-4.6 | 80 | 265 | 18-8 | 340 |
AR-620-100 | 20 | 15 | 5.8-11.5 | 1.5-4.8 | 100 | 330 | 23-10 | 355 |
AR-325-100 | 25 | 18.5 | 5.9-11.8 | 2-5 | 100 | 385 | 29-14 | 405 |
AR-330-100 | 30 | 22 | 6-12 | 2-5.5 | 100 | 470 | 36-19 | 420 |
AR-340-150 | 40 | 30 | 7.3-14.5 | 2-60 | 150 | 510 | 41-21 | 1000 |
AR-350-150 | 50 | 37 | 7.5-15 | 2-60 | 150 | 570 | 52-22 | 1080 |
AR-360-150 | 60 | 45 | 7.8-15.5 | 2-60 | 150 | 630 | 62-25 | 1150 |
AR-370-150 | 75 | 55 | 8-16 | 2-60 | 150 | 825 | 82-40 | 1200 |
1.Q:Are you a factory or trading company
A: We are a factory, we have rich experience for manufacuring water processing equipment for more than 10 years.
2.Q:Where is your factory located? How can i visit there?
A: Our factory is located in Guanhai road #1137, Zhucheng City, Shandong Province,China. It is about 1.5 hours from Qingdao airport. We can pick you up if you need, welcome to visit our factory.
3.Q: Do you have minimum order quantity request?
A: No minimum order, but it can get a discount if you order a large quantity.
4.Q: Do you have certificates?
A: Yes, we have ISO,SGS, BV certificate.
5.Q: Can you meet my special requirements for my products?
A: Yes, we have a professional design team. We can provide drawings according to your requirements.
6. Q:How to buy your idea products?
A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
7. Q:How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
8. Q:What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
9. Q: How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
10. Q: How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
11. Q: How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
12. Q:How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.