It can be mainly divided into two forms:
1. Telephone guidance: Assign a dedicated person to provide debugging guidance services, track the entire debugging guidance process, view and analyze debugging data, provide timely debugging guidance opinions, avoid debugging deviating from the correct track, and solve problems that on-site debugging technicians cannot solve.
2. On site guidance: On site technical guidance: 2.1. Professional personnel will provide on-site technical guidance on the steps and methods of debugging operations. 2.2 Guide water quality testing, indicator control, and ledger recording.
Service standards:
1. The system was successfully debugged within the scheduled debugging time and can operate normally.
What the customer needs to provide:
1. Detailed requirements for guiding requirements.
2. The conditions, materials, and equipment required for on-site debugging.
3. Time requirements.
Plan duration and delivery format:
1. Delivery time: 10-60 working days.
2. Delivery form: Delivery of effluent compliance system
Fee standard:
1. One person per day charges 800 yuan
2. The technical service fee is charged at a rate of 10000 to 30000 yuan per transaction.
3. The technical service fee is charged at 0.3% of the total project investment. The actual calculation fee will be charged for the 10000 to 30000 range above. Fees will be charged based on the first two standards for items below or exceeding.
4. The overall cost consists of two items: 1 and 2.