LED floodlight 1000w for cricket ground
Product Features:
*LED floodlight 1000w for cricket ground Meanwell LED Drivers,AC185~305V,PF>0.95,THD<15%.
*30°/60°/90°×135°beam angles and excellent uniformity.
*Ultra-low luminous decay<10% in 5 years. L70>50,000hrs.
*Junction temperature<70℃,good heat dissipation provide longer lifetime.
*Intelligent dimming system.0~10V,DMX and DALI dimming models are available.
Product Specification:
Watt | Model | Lumen | Color temperature |
300W | BW-FL-300W | 100-265V AC 5 Years warranty 50000 hours lifespan IP67 180LM/W AC 185~305V Meanwell driver |
2700-6500K |
400W | BW-FL-400W | ||
500W | BW-FL-500W | ||
600W | BW-FL-600W | ||
700W | BW-FL-700W | ||
800W | BW-FL-800W | ||
900W | BW-FL-900W | ||
1000W | BW-FL-1000W |
Detailed Images:
Test
Application:
Can be installed in Parking lot, Stadiums, Garage, street, roadway and park etc.
Installation:
FAQ:
Q: What does LED stand for?
A: LED stands for Light Emitting Diode”, as the name states - are diodes. A diode is a semi-conductor device that permits current flow in one direction. Semiconductor diodes are a junction of two materials. One material has a surplus of positive charge (holes), and the other a surplus of negative charge (electrons). When one applies a forward voltage, the electrons and holes are brought together. They combine and release light energy - the 'light emitting' part of the name.
Q: How long can I get the sample and mass production order for led floodlight 1000w?
A: The lead time for sample is within 7 days and the lead time for mass production is usually 10-15 working days.
Q: What is your main products?
A: We are manufacturer specialized in led indoor lighting ( led bulb, led ceiling lamp and led tube., ect) and led outdoor lighting (led flood light, high bay light, ect ).
Q: Do you accept OEM and can I apply my brand to flood light for cricket ground?
A: Yes, we do OEM and we can produce goods with your brand.
Q: How long is warranty of led flood light for football field?
A: We offer 5 years warranty for our products. It depends on product price and customer requirements.