3 Phase Ac Hydropower Plant Equipment High Water Head Pelton Turbine Generator
Pelton turbine
It is an impulse turbine wherein the flow is tangential to the runner and the available energy at the entrance is completly
kinetic energy. It is prefered at a very high head and low discharge with low specific speeds. The pressure available at the inlet and
the out let is atmospheric.
Pelton turbines can be arranged either by a horizontal or a vertical shaft. In general, a horizontal arrangement is found only in the medium
and small sized turbines woth one or two jets. Some horizontal pelton turbines have however, been built with four jets as well. Large pelton turbines with many jets are normally arranged with a vertical shaft. The jets are symmetrically distributed around the runner to balance the ject forces.
Pelton turbine water wheel
Parameters of the product
Runner range | 45cm~180cm |
Speed range | 150RPM~1000RPM |
Efficiency | 85%~93% |
Water head | 100~1000m |
Nozzle number | Single/Multiple |
Frequency | 50HZ/60HZ |
Generator Voltage | 400V, 800V, 6300V,10500V |
Layout pattern | Horizontal or Vertical |
Material(blades) | Stainless Steel ZGoCr13Ni4Mo |
Generator Insulation | F/F |
Excitation | Brushless or Static excitation system |
About our company:
Deyang Dongsen Hydropower Equipment Co.,Ltd is a professional comprehensive technology engineering company in design, manufacturing, installation and maintenance of hydropower equipment as well as in the hydropower station investment.
Our market:
South America, Southeast Asia, Africa, Europe, America, Asia, etc.
We have:
5 types of water turbine generator: Francis turbine, Pelton turbine, Turgo turbine, tubular turbine and kaplan turbine.
We offer:
1. Professional advice for client.
2. provide site instruction.
3.we always find the most efficient solution for our customers.
Why choose us?
1.Rich experience---served for more than 500 HPPs
2. Long life span: 30~50 years
3. Top-class design--from DEC
4. Quality guarantee---AAA
5. Delivery guarantee--flexible and high efficiency
6. Lower cost---lower management and labor cost
7. convenient---from penstock to commissioning