Coring Investigation XY-1A 150 Meters Hydraulic Wheels Mounted Drilling Rig
Product Introduction
Xy-1a drilling rig is a hydraulic feed portable drilling rig, 150 meters drilling depth ,150mm hole diameter , It is a kind of hydraulic feeding, high speed, high speed torque belt and portability with pump.which is suitable for engineering geological exploration of industrial and civil buildings, railways, hydropower, transportation, bridges, dam foundations and other buildings.
Product Technical Information
Drill | Swivel Head | ||
Drilling depth
| Max.150m | Spindle speed
| 1010,790,470,295,140(r/min) |
Hole diameter
| Max.150m | Spindle stroke | 450kmm |
Drill rod diameter | 42mm | Spindle pull-down | Max.15KN |
Angle range | 90-75 | Spindle lifting capacity | Max. 25KN |
Oil pump | Water pump | ||
Model | YBC-12/125 | Model | Horizontal reciprocating single-acting piston pump |
Rated pressure | 12.5Mpa | Working pressure | Max. 1.25Mpa |
Flow speed | 8ml/r | ||
Rated speed | 1500r/min | ||
Hoist | Power(diesel) | ||
Max. lifting capacity | 15KN | Model(diesel engine | ZS1105 |
Hoisting drum revolution | 121,76,36(r/min)
| Rated power | 12.1KW |
Drum diameter | 140mm | Rated speed | 2200r/m |
WEIGHT | AROUND 600KG | ||
SIZE | 1620*970*1560mm |
Product Main Advantages
1. It has a hydraulic automatic feeding mechanism to improve drilling efficiency and reduce labor intensity.
2. It adopts the ball card clamping mechanism instead of the chuck, and can implement the non-stop bar, easy to operate, safe and reliable.
3.The hoist is equipped with a frame to form a double-sided support star structure that can withstand strong impact.
4.Four sets of bearing positioning of the vertical axle box ensure that the gyrator has sufficient rigidity to deal with complex geological conditions such as gravel layer and pebble layer.
5.This machine adopts a taper clutch, which has the characteristics of large transmission torque, convenient operation and maintenance-free.
Product Application & Scope
XY-1A drilling rig is mainly used for geological general investigation and exploration, road and tall buliding foundation exploration, kinds of hole in concrete structure, river levees,earth temperature central air-conditioner,etc.XY-1A Series are spindle core geotechnical drilling rigs most perfectly suitable for borehole drilling in geo-construction and geo-technical exploration drilling in projects like civil building, construction of railway, hydropower, highway, bridge and dam etc
What should be paid attention to during the operation of the drilling rig?
a. When engaging the clutch or rotating the working wheel, it must be light, uniform and stable;
b. When changing the speed, engaging the horizontal and vertical axle boxes and changing each transfer handle, the clutch must be placed in the disengaged position or the working wheel must be stopped;
c. When using the lift, it is forbidden to press down the left and right handlebars at the same time;
d. After the gear oil pump starts, pay attention to the reaction of the oil pressure gauge and the hole bottom pressure indicator. In the process of drilling, when the pressure at the bottom of the hole needs to be increased or decreased, it should be adjusted gradually, and sudden increase or decrease is not allowed; When using the oil pressure system to quickly lift the vertical shaft (fast reversing rod), it is only allowed to carry out under the original load to prevent damage to the parts;
e. Before moving the XY drill, loosen the locking mechanism, wipe the guide rail clean and apply lubricating oil; It must be locked after moving;
f. Pay attention to the impact sound of all parts of the machine at any time; Whether the gearbox, bearing, shaft sleeve, horizontal and vertical shaft gearbox, etc. exceed the hot hand temperature (60 ℃), if so, it should be eliminated; g. All oil pressure control handles shall not be used at the same time;