Specifications
Model Number :
GY200
Certification :
SGS,CE,ISO9001
Place of Origin :
China
MOQ :
Negotiation
Price :
Negotiation
Delivery Time :
Within 7-12 days
Payment Terms :
T/T, Western Union
Brand Name :
ShiTan
Supply Ability :
2000 set/year
Packaging Details :
exported packing
Product Name :
GY 200 Exploration 300 Meters Borehole Drilling Machine For Mining Sampling
Key Words :
Exploration Drilling Rig ,Borehole Drilling Rig ,Sample Coring Rig
Type :
Core Drilling Rig
Usage :
Water Well,Exploration
Power Type :
Diesel
Voltage :
240V
Description

GY 200 Exploration 300 Meters Borehole Drilling Machine For Mining Sampling

Product Description:

Portable Rotary GY 200 Engineering Drilling Rig for the general exploration and investigation of solid mineral deposit, engineering geotectonic survey and concrete structure inspection holes.

Product Parameter:

Basic Parameter
Drilling depth 60m 225m 295m
Drilling diameter 300mm 76mm 46mm
Drill pipe diameter 50 42
Spindle turnable angle 0°~ 360°
Weight without engine 750 kg
Dimension (length * width * height) 1820 * 980 * 1400 mm
Rotary Table
Rotate speed 900, 475, 388, 205, 157, 68 r/min
Maximum torque 2000 N*m
Feeding travel 400 mm
Maximum cylinder feeding force 29 KN
Maximum cylinder lifting force 39 KN
Lifter
Lifting capacity 30 KN
Bobbin line speed, 2nd layer 0.27, 0.64, 0.83, 1.58, 1.64 m/s
Bobbin diameter 135 mm
Rope diameter 12.5 mm
Rope capacity 30 m
Oil pump
Displacement 20 Ml/R
Rated speed 2500 r/min
Rated pressure 20 MPa
Maximum pressure 25 MPa
Power
Rated power 14 KW (Y160-4 electric), 14.7 KW (ZS-1115 diesel)
Rated speed 1460 r/min (Y160-4 electric), 2200 r/min (ZS-1115 diesel)
Weight 144 kg (Y160-4 electric), 190 kg (ZS-1110 diesel)
Frame
Type Sliding type with base frame
Movable travel of drill 400 mm
Distance between drill and hole-opening 270 mm

Product Features:

1. Diesel engine and electric motor as power.(convenient for places of insufficient of electricity)
2. Integrative Drilling Tower:
Tower is supported by two high strength oil cylinder, hydraulic controlling the rise and fall of the tower. The operation is extremely convenient, saving time and labor effort,creating maximum benefit for the user.
3. Crawler mobile base :
The chassis used crawler type achieve rapid turnarounds, very convenient for movement.

4. Long stroke hydraulic supporting leg can be used for transportation, loading and unloading of the drill automatically without the help of the lifting equipment. The hydraulic leg can rapidly make the drill level in the coordination with the universal level instrument.
5. electric-start diesel engine:
It greatly reduces the labor intensity of operators, especially more efficient in the cold season when the diesel engine start is difficult, showing its great advantage.
6. The machine is equipped with a complete set of independent BW - 160 mud pump, with high pump flow rate and pressure, convenient maintenance, convenient to buy spare and accessory parts all around.

7. BW-160 mud pump is mounted on the rig, which is more practical in operation and save more space.

The specific steps of soil sampling method are as follows:

1. Distribution: samples shall be taken according to the soil type and the distribution of crop varieties, and according to the different soil fertility. The sampling points are distributed in zigzag or snake shape, which should be as uniform and random as possible.

2. Determine the sampling position and depth: the sampling position and depth shall be determined according to the thickness of the cultivated layer. Generally, the sampling depth is 0-20cm

GY 200 Exploration 300 Meters Borehole Drilling Machine For Mining Sampling

GY 200 Exploration 300 Meters Borehole Drilling Machine For Mining SamplingGY 200 Exploration 300 Meters Borehole Drilling Machine For Mining SamplingGY 200 Exploration 300 Meters Borehole Drilling Machine For Mining Sampling

Send your message to this supplier
Send Now

GY 200 Exploration 300 Meters Borehole Drilling Machine For Mining Sampling

Ask Latest Price
Watch Video
Model Number :
GY200
Certification :
SGS,CE,ISO9001
Place of Origin :
China
MOQ :
Negotiation
Price :
Negotiation
Delivery Time :
Within 7-12 days
Contact Supplier
video
GY 200 Exploration 300 Meters Borehole Drilling Machine For Mining Sampling
GY 200 Exploration 300 Meters Borehole Drilling Machine For Mining Sampling

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Supplier
7 Years
hebei, jinzhou
Since 2010
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
50000000-100000000
Employee Number :
100~120
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement