Mobile Water Well Drilling Rigs / GK-180 Rock Core Drilling Machine Color Customised
Product Introduction
GK-180drilling rig is developed to synthesize the advantages of various drilling rigs. The new kind of shallow hole drilling rig is mainly used in engineering geological survey and secondly used in core drilling.
Drilling rig parameters
GK-180 Drilling rig | |
Drilling depth | 180m |
Drill rod caliber | 42mm |
Hole diameter | 75mm |
Drilling angle | 90°-75° |
Dimensions | 2120*875*1480mm |
Weight(without power unit) | 750kg |
Swivel head | |
Spindle speed | 71,182,310,790r/min |
Spindle stroke | 450mm |
Upward displacement speed of idling vertical spindle | 0.05m/s |
Downward displacement speed of idling vertical spindle | 0.067m/s |
Spindle pull-down max. | 15KN |
Spindle lifting capacity max. | 25KN |
Spindle max.torque | 1.5KN.m |
Brake diameter | 278mm |
Brake belt width | 50mm |
Hoist | |
Max. lifting capacity | 20KN |
Hoisting drum revolution | 20,39,85,170r/min |
Drum diameter | 140mm |
Wire rope diameter | 9.3mm |
Wire rope capability | 40m |
Oil pump | |
Model | YBC-20/125 |
Rated presure | 12.5Mpa |
displacement | 20ml/r |
rated speed | 800-2500r/min |
Water pump | |
Displacement max. | 95(77)L/min |
Working pressure max. | 1.2Mpa |
Rated pressure | 0.7Mpa |
Liner diameter | 80mm |
Piston stroke | 100mm |
Power(diesel engine or motor) | |
Rated power | 16.2KW |
Rated speed | 2200r/min |
1 Application and scope
1.1 Engineering geological investigation of railways, hydropower, traffic, bridges, dam foundations and other buildings.
1.2 Geological core drilling, physical prospecting.
1.3 Small grout Confucius, drill hole drilling.
1.4 Small well drilling.
The drilling rig is equipped with a ball mounted card blessing mechanism with six side active drill rods. The utility model can perform no stopping and falling rod. And it has the advantages of high work efficiency, convenient operation, safety and reliability. It is compact, small in size, light in weight, strong in decomposition and easy to remove .
How can we do a good job in the maintenance of well drilling rig? Today, I'll talk about the five steps of well drilling rig
1. Pay attention to check whether the bolts and nuts of water and gas pipelines and various accessories of the drilling rig are firm at any time
2. .Always check the lubricating oil condition of the wind motor
3. .When the working face is immersed in water, a large-diameter drill head shall be used to insert the drill pipe when opening the hole, so that the drill pipe is 1-2 meters above the water surface to prevent mud and rock slag from falling into the hole
4. .The drilling rig is not allowed to reverse during drilling operation, so as to prevent the drill pipe from falling into the hole
5..When the drilling rig stops working for a short time, a small amount of air pressure shall be given to prevent sediment from invading the interior of the percussion device of the drilling rig. If the drilling rig stops working for a long time, the percussion device shall be lifted 1-2m away from the hole bottom for fixation