Rotary ST200 Water Well Drilling Rig , Borehole Mining Diamond Core Drilling Rig
TheST-200 mobile drilling rig is a kind of widely used and hydraulic feeding drill, which has the characteristics of big power, great lifting force (2T) and high transmission torque. It can be used in engineering geological survey of railway, hydropower, transportation, bridge, foundation and other buildings, geological core drilling and physical exploration and so on.
Drilling rig parameters
Unity machine parameter | |
Drilling depth | 200m |
Max. open hloe caliber | 300mm |
Drilling angle | 90°~75° |
Drill weight (No include power) | 610kg |
Unity machine dimensions | 2.1×0.9×1.3m |
Spindle | |
Spindle speed | 130, 300, 480, 730, 830, 1045r/min |
Spindle stroke | 450mm |
Hoist | |
Max.single line hoisting capacity | 1600kg |
Single line lifting speed | 1.06, 0.67, 0.32m/s |
Wirerope caliber | 13mm |
Wirerope cubic measure | 35m |
Hug floodgate caliber | 254mm |
Hug folldgate belt width | 50mm |
Distance between drill and hole | 230mm |
Mud pump | |
Type | Horizontal single urn twin-action |
Displacement | 170L/min |
Maximum pressure | 1.5Mpa |
Work pressure | 0.7Mpa |
Power | |
Diesle engine | S1105 18HP |
Electric motor | Y160M—4 15KW |
What aspects should we pay attention to in the drilling process of water well drilling rig
Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.
1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.
2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.
3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.
Why is the water well drilling rig not suitable for use in rainy days?
After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large draw down pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain super elevation, and the frozen soil in the backfill in winter shall not exceed 15%.