Specifications
Brand Name :
ShiTan
Model Number :
ST-200
Certification :
ISO9001
Place of Origin :
China
MOQ :
1 set
Price :
USD4200-5000/set
Payment Terms :
L/C, D/P, T/T, D/A, Western Union, MoneyGram
Supply Ability :
1800sets/year
Delivery Time :
7 working days
Packaging Details :
Plastic film and Standard export wooden box
Drilling depth :
200M
Angle range :
75°-90°
Drill rod diameter :
42,50,60mm
Diesel engine :
12.1KW
Rated speed :
2200R/min
Weight :
600kg
Description

Rotary ST200 Water Well Drilling Rig , Borehole Mining Diamond Core Drilling Rig

Product Description

TheST-200 mobile drilling rig is a kind of widely used and hydraulic feeding drill, which has the characteristics of big power, great lifting force (2T) and high transmission torque. It can be used in engineering geological survey of railway, hydropower, transportation, bridge, foundation and other buildings, geological core drilling and physical exploration and so on.

Drilling rig parameters

Unity machine parameter
Drilling depth 200m
Max. open hloe caliber 300mm
Drilling angle 90°~75°
Drill weight (No include power) 610kg
Unity machine dimensions 2.1×0.9×1.3m
Spindle
Spindle speed 130, 300, 480, 730, 830, 1045r/min
Spindle stroke 450mm
Hoist
Max.single line hoisting capacity 1600kg
Single line lifting speed 1.06, 0.67, 0.32m/s
Wirerope caliber 13mm
Wirerope cubic measure 35m
Hug floodgate caliber 254mm
Hug folldgate belt width 50mm
Distance between drill and hole 230mm
Mud pump
Type Horizontal single urn twin-action
Displacement 170L/min
Maximum pressure 1.5Mpa
Work pressure 0.7Mpa
Power
Diesle engine S1105 18HP
Electric motor Y160M—4 15KW

What aspects should we pay attention to in the drilling process of water well drilling rig

Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.

1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.

2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.

3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.

Why is the water well drilling rig not suitable for use in rainy days?

After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large draw down pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain super elevation, and the frozen soil in the backfill in winter shall not exceed 15%.

Rotary ST200 Water Well Drilling Rig , Borehole Mining Diamond Core Drilling RigRotary ST200 Water Well Drilling Rig , Borehole Mining Diamond Core Drilling RigRotary ST200 Water Well Drilling Rig , Borehole Mining Diamond Core Drilling Rig

Send your message to this supplier
Send Now

Rotary ST200 Water Well Drilling Rig , Borehole Mining Diamond Core Drilling Rig

Ask Latest Price
Watch Video
Brand Name :
ShiTan
Model Number :
ST-200
Certification :
ISO9001
Place of Origin :
China
MOQ :
1 set
Price :
USD4200-5000/set
Contact Supplier
video
Rotary ST200 Water Well Drilling Rig , Borehole Mining Diamond Core Drilling Rig
Rotary ST200 Water Well Drilling Rig , Borehole Mining Diamond Core Drilling Rig

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Supplier
7 Years
hebei, jinzhou
Since 2010
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
50000000-100000000
Employee Number :
100~120
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement