Drilling Depth 450 Meter Crawler Pneumatic Rotary Water Well Drilling Rig Machine Prices For Sale
ST 450 Pneumatic Drilling Rig Description
The mutifunctional drill rig of geothemal well is an improved device. Equipped with the Yuchai four cylinder engine, the drill rig meets national standards for emissions and environment. Meanwhile, the hydraulic system, supporting configuration and appearance, etc. have been optimized, thus improving the performance and working efficiency. The double rotation motor increased the rotaty torque and revolving speed.
ST 450 Pneumatic Drilling Machine Technical Information
Drilling Depth | 450 meters |
Dia.hole | φ105-305mm |
Advance Length once | 6.6m |
Working pressure | 1.7-3.3MPa |
Air consumption | 17-35m³/min |
Length of rod | 1.5m,2m,3m, (6m can be choosed) |
Dia. Of rod | φ89,φ102,φ114 |
Lifting power | 24T |
Rotation torque | 6200-8500 N.m |
Rotation Speed | 55-115r/min |
Diesel Engine | Yuchai |
Engine Power | 85Kw/2200rpm |
Travelling speed | 0-2.5 Km/h |
Climb capacity | 30° |
Weight | 9000kgs |
Dimension | 5500x1900x2780mm |
Application | Complicated geological conditions: Rock, Mud, Sand etc. |
Drilling Way | Top drive hydraulic rotary and propulsion, Dth Drilling or Mud Pump Driling |
DTH Hammer | 4",5",6",8",10" Drill hammer or CIR110, 130, 150,170 |
ST 450 Pneumatic Drilling Machine Advantages
It has the advantages of advanced structure, convenient use, high work efficiency, high reliability and good durability. It is widely used in wellbore applications such as drilling wells, agricultural irrigation wells, geothermal air conditioning wells, etc. It is especially suitable for mountain and rock formation water intake projects. The rig adopts new hydraulic technology, dual hydraulic motor rotation and large diameter hydraulic cylinder, which greatly reduces labor intensity, shortens auxiliary time, and improves construction efficiency and engineering quality.
What can we do for you?
1. It has different models used for water well drill rig,mine blast hole drill,underground drill project,,etc
2.T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
3.Generally, it will take 7 -10 working days after receiving your advance payment.
The specific delivery time depends on the items and the quantity of your order.
4.Our main machine enjoys a 1 year warranty(except for the hammer), during this time all accessories
broken can be changed for a new one.And we provide videos for machine install and operation.
Attentions during drilling
Due to different geological structures in different places, different geological structures are often encountered in the drilling process of drilling machine. In order to achieve good drilling effect, it is necessary to understand the drilling methods of different geological layers
For example, when drilling gypsum layer, the drilling fluid shall be pretested first. Calcium ions can be removed by adding anti gypsum treatment agents such as soda ash calcium removal and viscosity reducer. At the same time, viscosity reducer with strong calcium resistance shall be used to control viscosity cutting, and materials such as fluid loss reducer and anti sloughing agent shall be supplemented to maintain the stability of the performance of the drilling fluid, so as to improve the anti gypsum pollution ability of the drilling fluid in the drilling machine