ST 50 Portable Easy Movement Soil Testing Drilling Machine
Product Introduction
This is a small sampling drilling equipment suitable for plains, mountainous areas and areas with inconvenient transportation and energy. It is now widely used in railway, water conservancy and other construction projects, as well as geological core drilling and small grouting holes in wild mountainous areas.
Product Technical Data
Drilling Rig Model | ST50 drilling rig |
Drilling depth (m) | The max. 50 meter |
Hole size diameter | 73-108mm |
Drill pipe diameter | 42mm |
Vertical spindle speed | 70-650 |
Reverse rotation speed | 50-130 |
Power | 5.7KW |
Outsize | 1180×680×1600mm |
Weight (including Gasoline engine ) | 208kg |
Product Advantages
1.Equipped with diesel engine or single-phase and three-phase electric power.
2, Wide usage range: the dimension is less than 1 square meters, height can be controlled within 2.6 meters, weight is about 100kg, so that can be outdoor operations, but also for indoor use.
3, Can borehole with spiral drill pipe and drag bit , use core barrel for sampling, water circulation drill for water wells.
The machine has the advantages of small dimension, weight is 100 kg, easy to carry and to operate in the narrow space, it is best mini exploration and drilling operators assistant! the rigs has design with Reasonable structure, simple, easy to handle, easy to use, recommended diameter of 120 mm or less, depth of about 80 meters. total height of less than 2.6 meters, can work in the room. can be drill 10 to 20m in soft formation.
Product Main Applications
The rig is suitable for geological drilling in complex terrains such as mountains, hills, and rivers, engineering geological survey of buildings, and drilling of blast holes. In order to meet the needs of different users, the rig can be equipped with one of the three powers of diesel engine, gasoline engine or motor.
1.Construction drilling of the projects e.g. prospection, geotechnical investigation, railway, road, port, bridge, water conservancy and hydropower, tunnel, well, industrial and civil construction;
2. Coal mining exploration, Ore exploration;
3. Small hole diameter water well drilling;
4. Geothermal pipe-installing for heat pump;
5. Small-diameter hole foundation piling drilling
What problems should be paid attention to when drilling wells in rural areas?
Attention shall be paid to the following aspects: selecting appropriate well type; Reasonable well hole layout; Configure appropriate water pump; Adopt correct construction methods.
1. Select places as far away from sewers, sewage pipes and river banks as possible.
2. The well must be lined with bricks in time, and the deeper the well is, the more timely the lining is to prevent collapse.