GY200 Engineering Drilling Rig 22 HP Horsepower For Exploration Coring
Product Description:
GY 200 Engineering Drilling Rig a light multifunctional engineering project prospecting drilling rig. It was based on GY-200-1A.It was designed for geologic structure prospecting of industrial and civil constructions, such as railways, bridges and hydroelectric projects. The drilling machine could also being used for small calibre piling foundation works.
Product Parameter:
Basic Parameter | |||||
Drilling depth | 60m | 225m | 295m | ||
Drilling diameter | 300mm | 76mm | 46mm | ||
Drill pipe diameter | 50 | 42 | |||
Spindle turnable angle | 0°~ 360° | ||||
Weight without engine | 750 kg | ||||
Dimension (length * width * height) | 1820 * 980 * 1400 mm | ||||
Rotary Table | |||||
Rotate speed | 900, 475, 388, 205, 157, 68 r/min | ||||
Maximum torque | 2000 N*m | ||||
Feeding travel | 400 mm | ||||
Maximum cylinder feeding force | 29 KN | ||||
Maximum cylinder lifting force | 39 KN | ||||
Lifter | |||||
Lifting capacity | 30 KN | ||||
Bobbin line speed, 2nd layer | 0.27, 0.64, 0.83, 1.58, 1.64 m/s | ||||
Bobbin diameter | 135 mm | ||||
Rope diameter | 12.5 mm | ||||
Rope capacity | 30 m | ||||
Oil pump | |||||
Displacement | 20 Ml/R | ||||
Rated speed | 2500 r/min | ||||
Rated pressure | 20 MPa | ||||
Maximum pressure | 25 MPa | ||||
Power | |||||
Rated power | 14 KW (Y160-4 electric), 14.7 KW (ZS-1115 diesel) | ||||
Rated speed | 1460 r/min (Y160-4 electric), 2200 r/min (ZS-1115 diesel) | ||||
Weight | 144 kg (Y160-4 electric), 190 kg (ZS-1110 diesel) | ||||
Frame | |||||
Type | Sliding type with base frame | ||||
Movable travel of drill | 400 mm | ||||
Distance between drill and hole-opening | 270 mm |
Product Advantages:
Wide range if P.R.M and well-set gears
Great torque in low P.R.M, fit for coring drilling and piling hole works.
Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.dismantled and handled easily and safely.Optimized structure, small volume, and lightweight.
Drilling Working Attentions:
Operations during the exploration process:
Select appropriate drill bits and drilling parameters based on geological conditions.
Regularly check the wear of drill bits and replace severely worn ones in a timely manner.
Monitor the status of the hydraulic and lubrication systems to ensure their normal operation.
Adjust the angle of the turntable to adapt to different geological formations and drilling requirements