Economic Prices Under Running Bridge Crane
Brief introduction | Under running bridge crane travel on crane runways attached to existing roof structures,which saves you the cost of installing additional crane runway supports. In this way,the entire workshop area is available for production. It is also possible to employ a bypass control system to enable only certain parts of the factory space to be accessed. The lateral overhangs can be used to extend the travel path of the travelling hoist beyod the span dimension. |
Components |
1.Steel strucure:Main beam,end carriages, 2.Lifting mechanism:Electric hoist with trolley travelling along the cantilever, |
Control method | Remote control or pendent line with press button. |
Design and construction rules | All the standards which is required for the crane is the Chinese standard |
Painting |
1.Primer and finishing paint, 2.Color:According to your demand, 3.Average thickness:About 100microns |
Power supply | 380V/50HZ or as per client's requirement. |
Motors | Nanjing Zongchang(Number 1 in China) |
Hoisting mechanism | CD/MD model electric hoist |
Speed | Single speed/Double speed |
Manufacturing standard | All crane design and manufacturing is according to Chinese standard but customized products are available |
Safety feature |
1.Limit switch, 2.Overload stop device for hoisting, 3.Long bearing buffer for crane travelling, 4.Power failure backup. |
Payment term | 40% payment in advance and the balance paid before delivery by T/T |
Shipping port | Qingdao/Tianjin/Shanghai |
Warranty | 12 months |
Order tips |
1.Lifting capacity. 2.Span length(cantilever length), 3.Lifting height(hook center to ground), 4.Power supply:voltage, 5.Working condition:Which material to lift?temperature? 6.Would be better if you have drawings of your plant. |