Carbon Steel Black Steel Pipe Cap 8" 234wpb Butt Weld Carbon Steel Caps
Description:
A pipe fitting cap is a type of plumbing component used to cover the end of a pipe. It is a fitting that is designed to be installed at the end of a pipe to close off the flow of fluids or gases.
Pipe fitting caps can be made of different materials, such as metals like carbon steel or stainless steel. They come in various sizes to fit different pipe diameters and can be threaded or glued onto the end of the pipe.
In addition to closing off the end of a pipe, pipe fitting caps can also be used as a protective cover to prevent dirt, debris, and other foreign objects from entering the pipe. They are commonly used in plumbing systems, industrial applications, and even in some residential settings.
Specifications:
Product Name | Butt Weld Steel Cap |
Product Material | 1.Carbon Steel: ASTM A234 WPB,WPC, ASTM,ASME A860 WPHY 42, WPHY 46, WPHY 52, WPH 60, WPHY 65, WPHY 70. 2.Low Temperature: A420 LF1,LF3, LF6, WPL3, WPL6, WPL9. 3.Alloy Steel: ASTM A234 WP1, WP2, WP5, WP9, WP11, WP12, WP22, WP91, WP92 |
Size | 1/2''-48''(DN15-DN1200) |
Thickness | Sch5-Sch160 XXS,STD,XS, SGP etc |
Application | Petrochemical industry, fertilizer,nuclear power, boiler,ship,environmental protection, aviation, pulp and paper, food, medicine and etc |
Delivery time | 20-30 days, after received advance payment. |
Advantage | high quality;faster delivery time;available in all sizes,customized; |
Packing | Wooden Cases, wooden pallet , carton box or as customers requirement |
FAQ:
1.)Are you a trading company or Factory?
We are a real factory with our own producing machine and warehouse,started to do business from year 1993
2.)How long time of your longer cooperation customer?
Many customers have long cooperation with us,such as European customer cooperated with us 15years.and more.
3.)What is your advantage?
Best quality,low price,special service,each customer information record.
4.)What about your delivery time?
quantity less than 500tons,25days after get deposit,above 500tons will need 30-35 working days.