Carbon Steel Welded Tees & Laterals Reducing Unequal Butt Weld Fittings
Description:
Steel tee is a T-shaped pipe fittings that has three branches, normally has two forms with Equal Tee and Reducing Tee (Tee reducer), both are used to divide (combine) the pipelines to adjust the flow rate and change the direction.
Specifications:
Carbon Steel Welded Tees & Laterals Reducing Unequal Butt Weld Fittings | |
Standards | ASME/ANSI B16.9, ASME/ANSI B16.11, ASME/ANSI B16.28,JIS B2311, JIS B2312 |
Radius | Short Radius(SR), Long Radius(LR), 2D, 3D, 5D |
Degree | 45 / 90 / 180, or customized degree |
Size Range | Seamless type: ½" up to 28" |
Welded type: 28"-to 72" | |
WallThickness | SCH STD,SCH10 to SCH160, XS, XXS, |
Carbon Steel | A234 WPB, WPC; A106B, ASTM A420 WPL9, WPL3, WPL6, WPHY-42WPHY-46, WPHY-52, WPHY-60, WPHY-65, WPHY-70, |
Alloy Steel | A234 WP1, WP11, WP12, WP22, WP5, WP9, WP91 |
Applications | Petroleum industry, chemical, power plant, gas piping, shipbuilding. construction, sewage disposal,and nuclear power etc. |
Packaging material | plywood cases or pallets, or as per customer's requirements |
Production Period | 35 working days after received the payment |
FAQ:
1.)Are you a trading company or Factory?
We are a real factory with our own producing machine and warehouse,started to do business from year 1993
2.)How long time of your longer cooperation customer?
Many customers have long cooperation with us,such as European customer cooperated with us 15years.and more.
3.)What is your advantage?
Best quality,low price,special service,each customer information record.
4.)What about your delivery time?
quantity less than 500tons,25days after get deposit,above 500tons will need 30-35 working days.