CDL-300N water well drilling rig | ||||
Comprehensive overview | ||||
Depth:300M
| ||||
A. CHASSIS | ||||
Code | Name | Model | Remarks | |
A01 | Track chassis | Special Purpose for Engineering | ||
B.Drilling tower, Second floor chassis | ||||
Code | Name | Model | Parameter | Remarks |
B01 | Drilling tower | Retractable | Drill tower load:15T Operation:Two hydraulic support cylinders Drill tower height:6.8 | |
B02 | Pull up-Pull down cylinder | Cylinder-wire rope structure | Pull down:7T Pull up: 20T | |
B03 | Outrigger cylinder | High outrigger oil cylinder | self loading and unloading Brace:Four hydraulic leg cylinders Equipped with hydraulic lock to prevent leg retraction trip:1500MM | |
C. Drilling rig power | ||||
Code | Name | Model | Parameter | Remarks |
C01 | Diesel engine | Power:120KW Type:Four Cylinders, Water Cooling and Mechanical Supercharging Revolutions:1800R/MIN | ||
C02 | Diesel Engine Monitor | Matching | Monitoring information such as speed, temperature and so on through diesel engine sensors | |
D.Mud pump | ||||
Code | Name | Model | Remarks | |
D01 | Mud pump | 720L/MIN 3MPA | ||
E. Tool hoist | ||||
Code | Name | Model | Parameter | Remarks |
E01 | Hoist | ZYJ1B | Single rope pull up:1T | |
F. Rotation form hydraulic power head | ||||
Code | Name | Model | Parameter | Remarks |
F01 | Power head | Torque:7500NM Revolutions:0-90 RPM | ||
H. Other Parts and Components | ||||
Code | Name | Model | Parameter | Remarks |
H02 | Foam pump | B-36EX1 | Flow:42L/MIN Pressure:4MPA Revolutions:660R/MIN Improving the up-and-down efficiency of drilling cuttings, cooling and lubricating the impactor | |
I.operating system | ||||
Code | Name | Model | Parameter | Remarks |
I01 | Control box | Integrated console Lifting and boring tower, outrigger cylinder, lifting, lowering, power head , etc. Instrument: drilling tool weight gauge, system pressure gauge, etc. |