1.Usage: Bare copper wire drawing
2. Inlet diameter: Ф3.5mm-Ф2.5mm
3. Outlet diameter: Ф1.6mm-Ф0.4mm
4. Maximum mechanical speed: 1800M/MAX (1500M/MAX with annealing)
5. Drawing speed: Only for reference
Outlet diameter(mm) | 0.40-0.80 | 0.80-1.60 | |
Drawing speed(m/min) | 1800-1200 | 1300-600 | |
Drawing speed(m/min) | 1000-1500 | 1300-600 | |
Percentage elongation of wire | 25% | 30% |
6. Dies
Number: 17 dies (Customer self provided); Ф30mm-15mmT or Ф25mm-10mmT
The last die: Ф25mm-10mmT
Pedestal can be adjusted according to the capstan
7. Mechanism surface reduce rate:
From No.1 to No.16 20%
No.17 15.5%
8 Drawing lubrication: Fully immersing type
9. Drawing method: 4 shafts horizontal arrangement
10. Lubrication oil requirement: 100 liter/min
11. Drive motor: 75HP (55KW) induction motor
12. Spooler motor: 20HP (15KW) induction motor
13. Annealer: Maximum output power:
120KVA
14. Traversing: Traversed by 90W motor with position-limited switch
15. Safety door: Turn upward
2,Elements list
1. Pay-off stands 1 set
2. Main drawing machine 1 set
3. Annealer 1 set
3. Pneumatic tension controller 1 set
4. Take up machine without shaft 1 set
5. Electrical control cabinet 2 set
6. Console 1 set
Dual lines intermediate wire drawing machine with annealer and double PND630 take up copper wire drawing machine
4. Maximum mechanical speed: 1800M/MAX (1500M/MAX with annealing)
5. Drawing speed: Only for reference
Outlet diameter(mm) | 0.40-0.80 | 0.80-1.60 | |
Drawing speed(m/min) | 17DS | 1800-1200 | 1300-600 |
Drawing speed(m/min) | 17DST | 1000-1500 | 1300-600 |
Percentage elongation of wire | 25% | 30% |
6. Dies
Number: 17 dies (Customer self provided); Ф30mm-15mmT or Ф25mm-10mmT
The last die: Ф25mm-10mmT
Pedestal can be adjusted according to the capstan
7. Mechanism surface reduce rate:
From No.1 to No.16 20%
No.17 17%
8 Drawing lubrication: Fully immersing type
9. Drawing method: 4 shafts horizontal arrangement
10. Lubrication oil requirement: 100 liter/min
11. Drive motor: 75KW AC motor
12. Spooler motor: 15KW*2 AC motor
13. Annealer: Maximum output power: DC 60V,3000A
14. Traversing: Traversed by 90W*2 motor with position-limited switch
15. Safety door: Turn upward
二,Elements list
1. Pay-off stands*2 ................................1 set
2. 2 wires Main drawing machine ..........1 set
3. 2 wires Annealer .................................1 set
4. Take up machine with dancer.........2 set
5. Electrical control cabinet ............................2 set
6. Console............................................1 set
Equipment technical standards
1. 2 lines Main drawing machine:
1-1. Frame: Cast in iron; treated by annealing and abrasive blasting
1-2. Transmission: Transmission by gear
1-3. Capstan:
4-tier unity capstan*2
5 capstans in total; 4 capstans are same and exchangeable; the last capstan is independent
The surface of capstans are treated with tungsten carbide
1-4. Oil pipe of drawing: There are pipes are set up above the dies and capstans for cooling and lubrication; the capstans are totally immersed in drawing oil when machine is running.
1-5. Lubrication for machinery:
Spray lubrication for gears and bearings;
There is a visible spot on the mechanical lubrication oil box for oil inspecting.
1-6. Drive motor:75KW 4P 380V 50HZ AC motor;Transmission by C# triangle belt;
1-7. A manual pointing and threading unit is used to make the wire go through easily
1-8. Manual pointing and threading unit makes it easy to get wire through.
Others
1. Paint:Paint after rustproof production according to our standards or paint according to buyer’s requirements
2. The consumables:Capstan (6 months of guarantee);Distributing guide pulleys; Traversing guide pulleys; Flat belts
3. The period of guarantee:12 months for mechanical part (excluding the consumables) after the shipment;6 months for electrical parts after the shipment.Permanent maintenance (charge)
4. Test:
A. Employees form both of the company do the test together in our Company after the finish of the order;
B. If it is necessary, our staffs do the test in buyer’s company, the buyer offers flight ticket, board and lodging (USD80/DAY)
C. The buyer supplies all the material for the test
5. Maintenance: We offers long-distance mechanical support for free; if the engineers are needed to be in the buyer’s company for maintenance, the buyer offers flight ticket (SHANGHAI), board and lodging. (80USD/DAY)
6. Wooden pallets packing for shipping
SPECAIL STATEMENT
All information above are carefully checked, our company reserve explain right if any printing mistake or any misunderstanding.
Another: Sorry for noting no advanced notice for the techniques improvement or upgrade on the machine; Any change on the appearance or color, please refer to the real object.