UL2725 Multi Conductor Shielded Cable PVC Insulated Cable
① Rated temperature: 80ºC
② Rated voltage: 30V
③ Reference Standard: UL758, UL1581, C22.2 No.210
④ Passes UL VW-1 & CSA FT1 vertical flame test.
⑤ Uniform insulation thickness of wire to ensure easy stripping and cutting.
⑥ For internal wiring of electronic and electrical equipment and appliance.
Conductor | Insulation | Jacket | Max. Cond Resistance at 20°C (Ω/km) | ||
No. of Cores | AWG | Construction (No./mm) | Diameter (mm) | Diameter (mm) | |
2 | 30 | 7/0.10 | 0.80 | 2.70 | 381 |
4 | 30 | 7/0.10 | 0.80 | 2.90 | 381 |
8 | 30 | 7/0.10 | 0.56 | 3.50 | 381 |
2 | 28 | 19/0.08 | 0.70 | 2.20 | 239 |
11 | 28 | 7/0.127 | 0.82 | 5.20 | 239 |
11 | 28 | 7/0.127 | 0.66 | 3.65 | 239 |
13 | 28 | 7/0.127 | 0.66 | 4.50 | 239 |
4 | 26 | 7/0.16 | 1.00 | 5.00 | 150 |
FAQ:
Q1: Are you a manufacturer?
A1: Yes, we are a manufacturer located in Dongguan city of China. We are able to provide OEM/ODM services for wires, cables, custom cable assembly around the world.
Q2: Can I get a free sample?
A2: Yes, we are willing to provide sample in stock for free but freight collected. Welcome to contact us for customized products.
Q3: Is the quality of your product guaranteed?
A3: Yes, our workshop are equipped with Brand-new and Advanced Machines & Test Equipments. Our production process and quality control are in strictly accordance with the international standards and customers’ requirements.
Q4: What is the delivery lead time?
A4: Generally, the lead time is around 10-15 days for wire production, around 20-40 days for cable assembly. It depends on quantity and the complexity of the products.