① Rated temperature: 105ºC
② Rated voltage: 600V
③ Reference Standard: UL758, UL1581, C22.2 No.210
④ Passes UL VW-1 & CSA FT1 vertical flame test.
⑤ Uniform insulation thickness of wire to ensure easy stripping and cutting.
⑥ For internal wiring of electronic and electrical equipment and appliance.
22 | 17/0.16 | 0.76 | 0.80 | 2.30 | 59.4 |
20 | 26/0.16 | 0.94 | 0.80 | 2.60 | 36.7 |
18 | 16/0.254 | 1.18 | 0.80 | 2.80 | 23.2 |
16 | 26/0.254 | 1.50 | 0.76 | 3.10 | 14.6 |
14 | 41/0.254 | 1.88 | 0.76 | 3.50 | 8.96 |
12 | 65/0.254 | 2.36 | 0.82 | 3.90 | 5.64 |
10 | 105/0.254 | 3.00 | 0.80 | 4.61 | 3.55 |
8 | 169/0.254 | 3.77 | 1.21 | 6.20 | 2.23 |
6 | 7/38/0.254 | 5.41 | 1.52 | 8.45 | 1.40 |
4 | 19/37/0.20 | 6.81 | 1.52 | 9.80 | 0.88 |
2 | 19/35/0.254 | 8.65 | 1.53 | 11.80 | 0.55 |
Q1: Are you a manufacturer?
A1: Yes, we are a manufacturer located in Dongguan city of China. We are able to provide OEM/ODM services for wires, cables, custom cable assembly around the world.
Q2: Can I get a free sample?
A2: Yes, we are willing to provide sample in stock for free but freight collected. Welcome to contact us for customized products.
Q3: Is the quality of your product guaranteed?
A3: Yes, our workshop are equipped with Brand-new and Advanced Machines & Test Equipments. Our production process and quality control are in strictly accordance with the international standards and customers’ requirements.
Q4: What is the delivery lead time?
A4: Generally, the lead time is around 10-15 days for wire production, around 20-40 days for cable assembly. It depends on quantity and the complexity of the products.