Specifications
Brand Name :
Xcell Energy
Model Number :
XL-1520-MA
Certification :
SGS
Place of Origin :
Jiangsu, China
MOQ :
1 Set
Price :
Negotiated
Payment Terms :
T/T
Supply Ability :
1000m2/per pay
Delivery Time :
7 Days
Packaging Details :
Regular packaging/customizable
Name :
Black cooling tower fill
Condition :
New
Cooling Type :
Cooling Tower Parts
Material :
PVC,PP,CPVC
Width :
720/820/920/1020/1220/1520mm
Usage :
BAC Cooing Tower
Thickness :
0.32-0.6mm
Wave Height :
19-20mm
Description

Cross-Flow PP PVC Cooling Tower Fill Replacement

Description:

* The material used for the ML cooling tower filler is PVC/PP/ CPVC. The purpose of the filler is to increase the viscosity of the product, especially the small filler to increase the viscosity significantly. ML cooling tower fill before accumulation is subject to dehydration sale to avoid consuming some of the isocyanate. It must be noted that the changeable carbon anhydride will cause the resin to foam, which will deter the physical properties of the polyurethane resin.

* In order to speed up the wetting speed of ML cooling tower fill and reduce system viscosity. Still more and more fillers are increasing in the polyurethane resin, sometimes it is necessary to add a wetting and wetting dispersant in the resin in advance. In-mold paint is an additive with three benefits of coating, colorant and release agent.

* The ML cooling tower filler is evenly burst into the mold, and after the paint film is dried, the polyurethane sole, self-skin foam, and polyurethane soft foam can be molded. necessary products. If the envoy wants to say that the quality of the filling habits is determined, it still depends on the following aspects:

① ML cooling tower packing has a larger specific surface area (m2/m3 packing layer);

② ML cooling tower filler liquid has better mechanical properties of uniform distribution on the surface of the filler;

③ The packing airflow of Marley cooling tower can be evenly distributed in the packing layer;

④ ML cooling tower packing material is not without large porosity (m3/m3 packing layer). There are other caves, and factors such as its doctrinal strength, origin, artificiality and price should also be considered when choosing fillers carefully.


Specifications:
Tech Date
Sheet Width(mm) 720/820/920/1020/1220/1320/1530-1510mm
Sheet Length 250MM*N(N=4,5,6,7,8,9,10,11,12......)/customized
Thickness 0.32-0.6mm/customized
Sheet Spacing 19-20mm
Color grey/white/black
Material PP/PVC/CPVC

Crossflow Cooling Tower Fills PP PVC CPVC Cooling Tower Fill Or Cooling Tower SuppliersCrossflow Cooling Tower Fills PP PVC CPVC Cooling Tower Fill Or Cooling Tower Suppliers

Crossflow Cooling Tower Fills PP PVC CPVC Cooling Tower Fill Or Cooling Tower Suppliers

Related Cooling Tower Film Fill

Crossflow Cooling Tower Fills PP PVC CPVC Cooling Tower Fill Or Cooling Tower Suppliers

Cleaning Cooling Tower Tips

Cooling tower packing cleaning method:

1. Manual cleaning of the slag falling off in the cooling tower;

2. Rinse the packing repeatedly with a high-pressure water gun to remove the sludge and scale under cleaning;

3. Dissolve the TNB descaling agent with hot water at about 50°C, and then use the flushing pump to rinse the filler repeatedly until the scale is rinsed off (if the filler has a long service life, causing aging and collapse, it is recommended to replace the filler), and add algaecide at the same time. Completely kill biological algae and;

4. After confirming that all parts of the system are cleaned, drain the sewage;

5. Rinse the packing and the inside and outside of the tower body with clean water;

6. Restore all parts of the system, replenish water and use it;

7. After all recovery, please check and accept the management personnel of Party A;

8. Evacuate Party B's belongings and clean the site;

PACKING AND DELIVERY

Crossflow Cooling Tower Fills PP PVC CPVC Cooling Tower Fill Or Cooling Tower Suppliers

Crossflow Cooling Tower Fills PP PVC CPVC Cooling Tower Fill Or Cooling Tower Suppliers

Crossflow Cooling Tower Fills PP PVC CPVC Cooling Tower Fill Or Cooling Tower Suppliers

FAQ

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.

Send your message to this supplier
Send Now

Crossflow Cooling Tower Fills PP PVC CPVC Cooling Tower Fill Or Cooling Tower Suppliers

Ask Latest Price
Watch Video
Brand Name :
Xcell Energy
Model Number :
XL-1520-MA
Certification :
SGS
Place of Origin :
Jiangsu, China
MOQ :
1 Set
Price :
Negotiated
Contact Supplier
video
Crossflow Cooling Tower Fills PP PVC CPVC Cooling Tower Fill Or Cooling Tower Suppliers
Crossflow Cooling Tower Fills PP PVC CPVC Cooling Tower Fill Or Cooling Tower Suppliers
Crossflow Cooling Tower Fills PP PVC CPVC Cooling Tower Fill Or Cooling Tower Suppliers
Crossflow Cooling Tower Fills PP PVC CPVC Cooling Tower Fill Or Cooling Tower Suppliers

Xcell Energy Equipment (Suzhou) Co., Ltd.

Verified Supplier
1 Years
suzhou
Since 2019
Business Type :
Manufacturer, Exporter, Trading Company, Seller
Main Products :
Total Annual :
10000000-20000000
Employee Number :
>50
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement