Specifications
Brand Name :
BAC
Model Number :
BAC cooling tower parts
Certification :
SGS
Place of Origin :
Jiangsu, China
MOQ :
1 Set
Price :
Negotiated
Payment Terms :
T/T
Supply Ability :
1000m2/per pay
Delivery Time :
7 Days
Packaging Details :
Regular packaging/customizable
Condition :
New
Cooling Type :
Cooling Tower Parts
Material :
PVC,CPVC
Warranty :
1 Year
Name :
BAC cooling tower fill
Width :
1300mm
Usage :
Cooing Tower
Thickness :
0.38-0.6mm
Sheet Spacing :
20mm
Length :
2440mm/customized
Description

BAC Cooling Tower Filler | Cooling Tower Heat Dissipation Film

Specifications:

Tech Date
Sheet Width(mm) 1300mm
Sheet Length 2440mm/customized
Thickness 0.38-0.6mm/customized
Sheet Spacing 20mm
Color grey/black

The principle of operation of cooling tower fill is to put as much water surface area in contact with as much air as possible, for the longest amount of time possible. Film fills allow the water to form thin flowing sheets to expose as much water surface area as possible to the interacting flow.
Cooling tower sheet fills or media, come in many different forms and "micro-structures," each having unique characteristics to fit various applications. Film fills are selected for direct replacement, performance enhancement, and water condition compatibility. Each fill has performance characteristics that allow selections to be made for various heat loads, flow rates, water quality, and horse power combinations.

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

Related Cooling Tower Film Fill

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

• Outstanding thermal performance, will meet or exceed the performance of any OEM fill
• Unique method for quick and easy field installation, saves labor
• Nested shipment requires smallest fill staging area and low shipping costs
• Model-specific kits contain everything needed for an efficient installation, including detailed instructions, supports, hardware, and fill
• 2-week standard lead time

PACKING AND DELIVERY

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

FAQ

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.

Send your message to this supplier
Send Now

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

Ask Latest Price
Watch Video
Brand Name :
BAC
Model Number :
BAC cooling tower parts
Certification :
SGS
Place of Origin :
Jiangsu, China
MOQ :
1 Set
Price :
Negotiated
Contact Supplier
video
BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film
BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film
BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film
BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

Xcell Energy Equipment (Suzhou) Co., Ltd.

Verified Supplier
1 Years
suzhou
Since 2019
Business Type :
Manufacturer, Exporter, Trading Company, Seller
Main Products :
Total Annual :
10000000-20000000
Employee Number :
>50
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement