FJ6/DFY1,2 type Test Terminal Block for energy measuring
General:
FJ6/DFY1, 2 type energy measuring terminal blocks are special terminal blocks applied for standard wiring in energy measuring equipments.
They are also suitable for secondary circuit of rated voltage up to 660V and rated current up to 20A. They are used to change or inspect the electric equipments such as energy meter, electric instrument and relaying equipment under on-load circumstance. They can guarantee operation safety and improve fieldwork efficiency. In order to satisfy customers' demand, our company improves the design and adopts America-imported high-molecular polycarbonate material
It has advantages of high impact resistance, ageing resistance, anti water-absorption, flame retardant, high temperature resistance. It not only has bright and elegant appearance, but also excellent product performance. It solves former products problems such as fragile, easy mildew stain grow, or heavy CT secondary leakage, easy PT secondary breakdown, etc.. This kind of terminal block is an ideal successor of the older generation.
The technical parameter of this product is in conformity with international standards. Feedback from users shows that new type of this terminal block is capable of preventing missing electric energy measurement. It is helpful for energy measuring work, and can put an end to energy measuring accident effectively.
Main technical parameter:
Rated insulation voltage | 660V |
Frequency | 50Hz/60Hz |
Rated current | 5A(20A) |
Power frequency withstanding voltage | 3000V/min |
Insulation resistance | >30MΩ |
Ambient temperature | -40℃~+60℃ |
1 Where is your factory?
Our factory is located in Qiaoqian Industry Area, Liushi Town, Yueqing City, Zhejiang Province, 325603 China.
2 Are you manufacturer or business?
We are manufacturer established in 2002, and have over 16 years production experience.
3. Can I ask for samples?
Yes
4. What's the warranty of your products?
18 months
5. What's the lead time?
Depend on the quantity and model of the order, normally it takes around 2-3 days, but the
exact lead time should be discussed with our sales.
6. How about the MOQ, Payment term, Delivery port, and shipping date?
1)MOQ: 100 pcs/item based on existing packing.
2)T/T-30% deposit and 70% against copy of BL
3)L/C is also acceptable
4)Ningbo/Shanghai