18000-20000bph Big Capacity CE Standrad Water Filling Machine Production Line
20000bph Full Automatic PET Plastic Small Bottle Mineral Water Filling Machine Production Line
Inroduction of Water Production Line:
The water filling machine is consisted of ringsing-filling-caping all together. CGF water filling machine adpots the suspension design. It allows the machine to fill different type of the bottles. It is normally used as drinking water filling machine. However, it can also be used for fill PET bottle with fruit juice and tea at high temperature by simply change tha valve. It can be connected with our others machines to form the water filling machine and packaging machinery production line.
Model | CGZ8-8-3 | CGZ12-12-6 | CGZ18-18-6 | CGZ24-24-8 | CGF32-32-8 | CGF40-40-12 |
---|---|---|---|---|---|---|
Capacity | 3000BPH | 4000BPH | 8000BPH | 12000BPH | 15000BPH | 20000BPH |
Applicable bottle type | Bottle diameter:50-100mm; height:150-320mm;Volume:330-1500ml | |||||
Applicable bottle shape | Plastic Screw cap | |||||
Gas pressure | 0.6 | 0.6 | 0.6 | 0.6 | 0.6 | 0.6 |
Motor power | 2.3 | 3.1 | 3.5 | 3.8 | 3.8 | 4.2 |
Pressure | 2-3kg/cm2 | |||||
Machine size | 2.2*1.8*2.3 m | 2.45*1.65*2.1m | 2.6*1.8*2.1m | 3*2.2*2.4m | 4*2.2*2.4m | 4.1*2.782.6m |
Weight | 1800kg | 2000kg | 2500kg | 4200kg | 4800kg | 5000kg |
Machine's Details:
Bottled water plant machinery:
1. (Making bottle) Full automatic bottle blow machine or Semi automatic bottle blow machine
2. (Water Filtration) RO water purification machine / UF mineral water filtration machine.
3. (Filling water into bottle) Bottle washing filling and capping machine.
4. (Labeling bottle water) Shrink sleeve labeling machine or Sticker labeling machine.
5. (Printing the date on the bottle water) Date printing machine.
6. (package the bottle water) Full automatic shrink wrapping packing machine or Semi automatic shrink wrapping packing machine / Carton box packing machine.
Electrical Appliances Brand :
Electrical Appliances Brand | |||
![]() | ![]() | ![]() | ![]() |
CNP Water Pump | Siemens Main Motor | Siemens PLC | Siemens Inveter |
![]() | ![]() | ![]() | ![]() |
Siemens Touch Screen | Schneider Circuit Breaker | Schneider Contactor | Omron Relay |
![]() | ![]() | ![]() | ![]() |
Omron Sensor | SMC Solenoid Valve | SMC Cylinder | SMC Air Filter |
Q1: Where is your factory? How can I visit there?
<1>Installation, debug
After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary.
<2>Training
Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.
<3>Quality guarantee
We promise that our goods are all new and not used. They're made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.