HGY29S-3R Factory Concrete Spreader Concrete Distributor Concrete Placing Boom
Full hydraulic control of all boom movements provides smooth, precise control. The load sensing, proportional, pressure compensated hydraulic system provides accurate, predictable boom placement even during multi-function operation.
Extensive application of modular design technology and quick connecting components allows rapid assembly and hoisting of placing booms.
The German manufactured Siemens programmable login controller (PLC) is equipped with local, wired or 100m ultra long distance remote control.
This reliable system can be operated within four user selectable frequency bands.
Technical Specifications | ||||||
Model of Placing Boom | HGY29S-3R | HGY29P-3R | HGY29SC-3R | HGY29PC-3R | ||
Performance | Max. Radius (m) | 29 | ||||
Free Standing Height,Slewing Range | 22.7m,400° | |||||
Working temperature(℃) | 0~60℃ | |||||
Counter weight(kg) | / | 2930 | ||||
Total weight(kg) | 19100 | 22030 | ||||
Supply power to equipment | 380V/50Hz | |||||
Electric motor | Motor Model | Y2-160L-4 | ||||
Power(kw) | 15 | |||||
Hydraulic system | System pressure(MPa) | 32 | ||||
Flow(L/min) | 18 | |||||
Oil tank capacity(L) | 280 | |||||
Control mode | (Cable+Radio) remote control | |||||
Clearing mode for concrete pipe | Water clear / Dry clear | |||||
Section of tubular column (m×m) | 0.75×0.75 | |||||
Arm(Booms) | Boom model | fully hydraulic foldable arms | ||||
Delivery pipeline diameter | DN125mm | |||||
Length of end hose | DN125mm×3000mm | |||||
The first section | Length(m) | 10.9 | ||||
Articulation | -2.5°~82.5° | |||||
The second section | Length(m) | 9.6 | ||||
Articulation | 0°~180° | |||||
The third section | Length(m) | 8.5 | ||||
Articulation | 0°~180° | |||||
Climbing | Climbing Mode | Cylinder Jack Lifting | ||||
Internal Climbing Step Distance(m) | 0.52 | |||||
Floor Frame | Hole Prepared in Floor | |||||
Shaft Frame | Size of Climbing Shaft : 2.0m-2.7m | |||||
Min. Space Between Internal Climbing Frame | Climbing(m) | 3 | ||||
Placing Concrete(m) | 6 | |||||
Rest(m) | 6 |